Skip to content
ISO 9001:2015 · Est. 1981 · Dispatch before 15:00 · Salford

Work · Food processing

Bakery bun line — worm gearbox rebuilt from stock

Food processing
PHOTO: stripped worm gearbox, wheel, gaskets, seals and bearings on the bench
Problem
A bun line in a Greater Manchester bakery stopped on a failed worm gearbox. The OEM wanted a complete box on a lead time that would have written off the shift.
What Arrow did
Spare worm wheel, gaskets, seals and bearings were on the Salford shelf. We stripped the box, fitted the wheel and internals, and sent it back the same day.
Outcome
Line back up without a new gearbox. The worn wheel is now a stocked spare for that plant.
Send a drawing or sample →
CallSearch